VALE BASE METALS

Muon Tomography for Mapping Voids & Remnant Mineralization

Creighton Mine

PROJECT

Sudbury, Canada

LOCATION

Borehole

IDEON DETECTOR TYPE

Subsurface Voids & Remnant Mineralization

DEPOSIT TYPE

  • Provided Vale Base Metals with high-resolution visibility of the target zone using only four drill holes over a 6-month imaging period.
  • Identified areas of remnant mineralization to within 10 m spatial resolution, identifying untapped value in ore that had been left behind during historic extraction efforts.
  • Imaged a volume with a 2 km2 footprint around an active mine site with minimal operational or surface disruption.
  • Offered geotechnical insights on the size and location of historic underground workings, a historic sub-level cave, and several subsidence zone in the target area, informing future mine planning.
  • Resolved the base of the rubble zone under the open pit and heterogeneous density distribution within the rubble, giving the Vale Base Metals team confidence in their understanding of a large zone quickly, and important inputs for critical mine-planning decisions.

BACKGROUND

Located about 15 km west of Sudbury, Ontario, Creighton Mine is an underground nickel, copper, and platinum-group elements (PGE) mine. It is currently the deepest nickel mine in Canada, and one of the ten deepest mines in the world (at 2.4 km). Open pit mining began at Creighton in 1901, followed by underground mining in 1906. At one point, two-thirds of the world’s supply of nickel was mined there. The deposits at Creighton Mine were the first mineralized deposits discovered in the Sudbury Igneous Complex (SIC) mining camp, dating back to 1856. It hosts contact- and footwall-style mineralization. Current expansion plans could extend the life of Creighton Mine from 2027 to 2038.

IDEON SOLUTION

Ideon provided Vale Base Metals with a full-service imaging and intelligence program, including customized deployment design and modelling to ensure optimal outcomes, turnkey equipment bundling and installation logistics, continuous imaging with regular updates to show progressive resolution improvement, remote monitoring and diagnostics, geoscientific analysis and interpretation, and onsite results immersion.

The objective of the study was to demonstrate muon tomography for void mapping in an area where the geological model was well understood, helping validate models of the void area and lower the geotechnical risks involved in operations in an older mine site. Ideally, the survey would provide additional value to Vale Base Metals by successfully identifying areas of remnant mineralization that may have been deprioritized in earlier mining operations. The primary imaging target was the contact between competent rock and the rubble, at the bottom of the historic pit.

Ideon deployed 16 borehole detectors in four sensor arrays, down four drillholes positioned around the historic open pit on the Creighton site. The detectors were situated from approximately 200 m to 645 m deep and gathered data over a period of 6 months. Data intake and analysis in the Ideon cloud platform were conducted remotely via high-speed cellular connection to verify quality and system calibration, unlock near-real-time subsurface density imaging with continuously improving resolution.

Ideon then delivered a robust 3D density model of the target area using muon data without any constraining geological information. This was a blind, unconstrained data analysis. After the delivery of the 3D density model, results were mapped to the Vale geological model to validate outcomes.

Our goals for the deployment of muon tomography at Creighton were two-fold: accurately identify subsurface voids and rubble zones around the active mine site to help aid in geotechnical de-risking, and identify any high-density remnant mineralization we may have deprioritized years ago.
The outcomes validated our existing data and enhanced our knowledge meaningfully, prompting us to commit to follow-on work in Sudbury this year and sparking interest from out international operations.
Darren Hodder
Technical Leader, Mineral Resources and Mineral Reserves

The imaging program successfully met the primary objective of mapping subsurface void zones in good detail, proving the utility of muon tomography for geotechnical mapping purposes. The project also proved the capability in 3D mapping subtle mineralization regions with far superior geophysical methods. The information and insights generated from 4 boreholes over 6 months equates to that gathered over decades from more than 500 drillholes.

Download the full case study for detailed content and analysis at the Creighton project.